Engineering Product Innovation Center Construction Activity for the Period of May 20 – May 24

Anticipated construction activities for the week of May 20 – May 24:

1. 744 Commonwealth Ave – The contractor will install the steel reinforcing bars for the new concrete floor. The concrete floor is tentatively scheduled to be poured on Friday, May 24.

2. 750 Commonwealth Ave – The contractor will be performing the following activities:

a. Finish wall layout & start wall frame installation
b. Install rough overhead electrical work
c. Receive new HVAC duct material and start laying out duct configuration
d. Begin the demolition of plaster coating on exterior columns
e. Begin layout of the new bathroom